1.1 KiB
1.1 KiB
created, category, topic, start, year, url, status
| created | category | topic | start | year | url | status | ||
|---|---|---|---|---|---|---|---|---|
| 2025-12-02 |
|
|
The very long process of making 91 Meigh Road great again
Wiring
- Wring done during renovations/91 Meigh Road Renovations
- See photos from around the time of 2023-03-16.
- Kitchen East column
- (2x) 2core electrical cable to plant room Mitsubishi FTC6 and 210L Pre-Plumbed Standard Cylinder (I think, labelled 'Therm 1 & 2')
- (1x) CAT6 to ? (don't know where this goes, hallway thermostat??)
- Kitchen West column
- (1x) 2core electrical cable to plant room Vent Axia Sentinel Kinetic Plus B Right MVHR (I think, labelled 'Therm 1 & 2')
- (1x) CAT6 to MVHR (I sure I put one in from the photos around back of MVHR)
- Hallway thermostat
- (1x) 2core electrical cable to plant room DHW cylinder (FTC6)
- (1x) CAT6 to plant room network bundle
Rooms/Areas
Loft
Master bedroom
Some notes I made to work what materials I'd need. RB 2025-11-03 08.56.40.pdf