30 lines
756 B
Markdown
30 lines
756 B
Markdown
---
|
|
created: 2026-01-10T07:32:31
|
|
category:
|
|
- "[[Note]]"
|
|
type:
|
|
- "[[MOC]]"
|
|
topic:
|
|
- "[[91 Meigh Road]]"
|
|
---
|
|
|
|
## [[91 Meigh Road Heating and DHW]]
|
|
|
|
## MVHR
|
|
- [[Vent Axia Sentinel Kinetic Plus B Right MVHR]]
|
|
- [[2025-12-05 Sentinel Kinetic MVHR Range Installation & Commissioning|Sentinel Kinetic MVHR Range Installation & Commissioning Manual]]
|
|
|
|
## Outdoor electrical cabinet
|
|
- Main cut-out fuse in outdoor cabinet is a 100A 22x58 (diameter x length) 500V-50KA
|
|
- blown sometime around 2025-11
|
|
- purchased a new fuse [[2026-01-20]]
|
|
|
|
## Water
|
|
- Main feed into the building is a 15mm plastic coated copper pipe.
|
|
|
|
## Wiring
|
|
|
|
See also [[91 Meigh Road Renovations]] for info on wires that I've preinstalled for potential future use
|
|
|
|
## Links
|
|
![[Down.base]] |