Initial commit
This commit is contained in:
30
Notes/91 Meigh Road Services.md
Normal file
30
Notes/91 Meigh Road Services.md
Normal file
@@ -0,0 +1,30 @@
|
||||
---
|
||||
created: 2026-01-10T07:32:31
|
||||
category:
|
||||
- "[[Note]]"
|
||||
type:
|
||||
- "[[MOC]]"
|
||||
topic:
|
||||
- "[[91 Meigh Road]]"
|
||||
---
|
||||
|
||||
## [[91 Meigh Road Heating and DHW]]
|
||||
|
||||
## MVHR
|
||||
- [[Vent Axia Sentinel Kinetic Plus B Right MVHR]]
|
||||
- [[2025-12-05 Sentinel Kinetic MVHR Range Installation & Commissioning|Sentinel Kinetic MVHR Range Installation & Commissioning Manual]]
|
||||
|
||||
## Outdoor electrical cabinet
|
||||
- Main cut-out fuse in outdoor cabinet is a 100A 22x58 (diameter x length) 500V-50KA
|
||||
- blown sometime around 2025-11
|
||||
- purchased a new fuse [[2026-01-20]]
|
||||
|
||||
## Water
|
||||
- Main feed into the building is a 15mm plastic coated copper pipe.
|
||||
|
||||
## Wiring
|
||||
|
||||
See also [[91 Meigh Road Renovations]] for info on wires that I've preinstalled for potential future use
|
||||
|
||||
## Links
|
||||
![[Down.base]]
|
||||
Reference in New Issue
Block a user