Initial commit

This commit is contained in:
2026-03-02 17:06:32 +00:00
commit 430dd71917
1190 changed files with 622790 additions and 0 deletions

View File

@@ -0,0 +1,30 @@
---
created: 2026-01-10T07:32:31
category:
- "[[Note]]"
type:
- "[[MOC]]"
topic:
- "[[91 Meigh Road]]"
---
## [[91 Meigh Road Heating and DHW]]
## MVHR
- [[Vent Axia Sentinel Kinetic Plus B Right MVHR]]
- [[2025-12-05 Sentinel Kinetic MVHR Range Installation & Commissioning|Sentinel Kinetic MVHR Range Installation & Commissioning Manual]]
## Outdoor electrical cabinet
- Main cut-out fuse in outdoor cabinet is a 100A 22x58 (diameter x length) 500V-50KA
- blown sometime around 2025-11
- purchased a new fuse [[2026-01-20]]
## Water
- Main feed into the building is a 15mm plastic coated copper pipe.
## Wiring
See also [[91 Meigh Road Renovations]] for info on wires that I've preinstalled for potential future use
## Links
![[Down.base]]